|
Can I run more than one instance of OPTO DISPLAY on the same PC?
|
|
3
|
61
|
November 23, 2026
|
|
Display values in groov View with commas
|
|
4
|
873
|
November 23, 2026
|
|
Epic Running Pac Control and EtherCat
|
|
4
|
101
|
November 22, 2026
|
|
Problem with open CSV file
|
|
6
|
280
|
November 22, 2026
|
|
Intergation with Codex/Cursor
|
|
5
|
94
|
November 22, 2026
|
|
Using rsyslog with SSH license on EPIC PR1
|
|
9
|
1279
|
November 22, 2026
|
|
Groov EPIC Permissions
|
|
4
|
342
|
November 21, 2026
|
|
Auto step does not honor delays in my chart
|
|
12
|
411
|
November 21, 2026
|
|
PAC Display what TrueType font is used?
|
|
2
|
74
|
November 20, 2026
|
|
Node-Red Node to Read EPIC Internal Battery Voltage
|
|
2
|
44
|
November 20, 2026
|
|
Is PAC display R9.6d compatible with Win11?
|
|
7
|
151
|
November 19, 2026
|
|
What future features would you like to see in groov View?
|
|
216
|
12640
|
November 18, 2026
|
|
TopicBench — a fast, powerfull, free open-source MQTT explorer
|
|
4
|
103
|
November 18, 2026
|
|
Groov EPIC shows "No application" and CODESYS won't boot after power cycle with weak/missing battery
|
|
11
|
133
|
October 30, 2026
|
|
Groov epic on codesys with Ethercat protocol
|
|
12
|
1760
|
October 30, 2026
|
|
Password Protect PAC Display Project
|
|
0
|
62
|
October 21, 2026
|
|
PAC Control calculate the total number of days
|
|
3
|
90
|
October 15, 2026
|
|
"Move Module" command not documented anywhere?
|
|
4
|
129
|
October 2, 2026
|
|
PAC R1 - Modbus Error -216, Register stuck at 32767 / 0 - PC1 Pressure Value Issue
|
|
8
|
156
|
September 17, 2026
|
|
S2 Replacement Power Plug
|
|
2
|
143
|
September 8, 2026
|
|
Struggling with upgrade from SNAP-AIRATE to EPIC MM1001
|
|
2
|
141
|
September 3, 2026
|
|
How does PAC Control determine if a strategy download is needed?
|
|
3
|
154
|
September 2, 2026
|
|
Set NTP Server IP Address via REST API
|
|
3
|
98
|
September 1, 2026
|
|
Project from PLC with different version of CODESYS
|
|
2
|
100
|
August 26, 2026
|
|
EPIC to RIO/EPIC Communications
|
|
2
|
103
|
August 17, 2026
|
|
Tag model for thermal validation data over MQTT/Sparkplug B
|
|
0
|
64
|
August 7, 2026
|
|
Multiple Groov EPIC Response to Power Loss Event
|
|
1
|
123
|
July 30, 2026
|
|
Soft PAC with Node RED
|
|
19
|
3046
|
July 30, 2026
|
|
I/O Modules/Slots not showing up in device tree in Codesys
|
|
1
|
129
|
July 29, 2026
|
|
NodeRED monitoring optical fiber traffic
|
|
1
|
138
|
July 25, 2026
|