Optimizing PAC Project Performance with Multiple Control Strategies?

Hi Jivijet, Welcome to the Opto22 forums!

Great questions.
For now, we have 4 links that are worth checking out. Two are PDFs that I strongly recommend you download and read end to end.
Third link is to a blog about the power of adding delays to all your charts (and every loop in every chart).
Last link is to a Forum post that only applies if you have groov View in the mix.

My reply to this post has all those links.
The forums are a great place for your sort of question as there are some subtleties that will depend on how you have things setup.

Here is another post that runs through some of those variables that the community would be more than happy to talk over here in this thread or a new one that is specific to a single topic.